@artemis.extwitter.linkNASA Artemis @artemis.extwitter.link
2026-11-24 16:48 UTC
Stacking of the Artemis III rocket started in September. The “short stack” configuration — consisting of the solid rocket boosters and core stage — was completed on Oct. 26. This short stack will be used to test the rocket before integrating the Orion spacecraft.
Link: Original Tweet (Truncated) (x.com/NASAArtemis/status/2125263277097689451)
2 likes, 1 reposts, 0 replies
3 Next post4 More from @artemis.extwitter.linkBackBluesky home