@sovereignprint.netSovereign Print @sovereignprint.net
2026-11-28 02:32 UTC
In Belgium, Google swapped three approved air-cooled datacentres for one liquid-cooled giant pulling 600m3 an hour from the Sambre River—and kept pouring concrete while the 2025 permit sat unapproved. Ask forgiveness, never water rights.
0 likes, 0 reposts, 1 replies
3 Next post4 More from @sovereignprint.netBackBluesky home