@wtredman.bsky.socialWill Redman @wtredman.bsky.social
2026-10-16 15:31 UTC
Maybe - it's a good point that the horizon the RNN has to be predictive over is short (but not zero). But, we find that the optimal prospective temporal-shift for predictive grid unit is around 10-20 time-steps (subpanel D), which is greater than the 1 timestep the RNN is predicting on
1 picture (not shown on this phone)
A reply in a thread.
2 likes, 0 reposts, 1 replies
3 Next post4 More from @wtredman.bsky.socialBackBluesky home