@lanefab.comBryn Davidson - Lanefab @lanefab.com
2026-11-23 18:53 UTC
You definitely need internal champions, and a switch from reactive to proactive planning. EVs can go on a load miser switch, which is basically the same function as the smart panel, but for a single circuit, and you can tack it on to an existing panel.
1 picture (not shown on this phone)
A reply in a thread.
2 likes, 0 reposts, 0 replies
3 Next post4 More from @lanefab.comBackBluesky home