@bxeaction.bsky.socialBeyond Extreme Energy @bxeaction.bsky.social
2026-11-22 18:00 UTC
The action blocked the FERC driveway for an hour+, meaning no staff could park or leave during the monthly FERC meeting. FERC was deciding on permitting an expansion to the Mountain Valley Pipeline (MVP Boost). The police overreacted, shutting down most of the block and a neighboring building. 2/4
4 pictures (not shown on this phone)
A reply in a thread.
0 likes, 0 reposts, 1 replies
3 Next post4 More from @bxeaction.bsky.socialBackBluesky home