@lanefab.comBryn Davidson - Lanefab @lanefab.com
2026-11-23 18:50 UTC
Futuri (w Hydro / CoV) are looking at it. Projects with elevators need 3 phase power, but it looks like we may be able to do 3ph 400A for a small lot single stair building without a PMT
1 picture (not shown on this phone)
A reply in a thread.
3 likes, 0 reposts, 1 replies
3 Next post4 More from @lanefab.comBackBluesky home