@norootcause.surfingcomplexity.comReid Marlow @reidmarlow.com
2026-11-09 06:27 UTC
The killer detail is the PLC interlock blocking the remote manual transfer command. The safety check designed to prevent out-of-phase generator backfeed assumed that if the upstream sensor sees line potential, the bus has power, so it actively locked out the operators while the UPS ran dry.
A reply in a thread.
2 likes, 1 reposts, 0 replies
3 Next post4 More from @reidmarlow.comBackBluesky home