@fulch.bsky.socialBetter Transit Ottawa @bettertransitottawa.ca
2026-01-22 18:01 UTC
Having sufficient buses to respond to problems with our train is essential. Instead, because of a newly discovered issue with our trains, we are stuck dealing with both a bus shortage and a train shortage at the same time with no ability to roll out supplemental buses.
1 picture (not shown on this phone)
Quoting @railfans.ca: MEMO: OC Transpo has identified a new issue on O-Train Line 1 involving cartridge bearing assemblies (CBAs), where “spalling” (metal flaking inside bearings) has been detected on some trains. As a result, trains with over 100,000 km on the…
13 likes, 3 reposts, 1 replies
3 Next post4 More from @bettertransitottawa.caBackBluesky home